Call Us Today! 203.876.8331

markzarrillo

markzarrillo

About markzarrillo

This author has not yet filled in any details.
So far markzarrillo has created 76 blog entries.

HARTFORD HEALTHCARE

ROLE: Construction Manager at Risk The OR Expansion and Pre/Post-Op Renovation Project is an ambitious undertaking encompassing 88,099 square feet of transformative space. This multi-phased renovation will introduce six state-of-the art operating rooms and twelve new PACU bays to the hospital, redefining the surgical experience for patients and staff

WESTHILL HIGH SCHOOL

ROLE: Construction Manager The proposed development will involve the demolition of the existing 350,000 square foot, two story brick masonry building, as well as the current softball/baseball fields and tennis courts. These facilities will be replaced with a brand new, state of the art 450,000 square foot high school designed to meet

PENFIELD PAVILION

ROLE: Construction Manager Bismark Construction acted as the CM from design development for remediation of the 29,445sf Penfield Pavilion located at Fairfield Beach and oversaw the excavation of an estimated 7,000 tons of contaminated soil underneath and around the perimeter of the building. This Project presented key challenges

BASSICK HIGH SCHOOL

ROLE: Construction Manager The New Bassick High School. Our first task during pre-construction was to provide multiple site analysis reviews as multiple sites were options for the City of Bridgeport. Our staff includes architect and civil expertise that is able to offer collaboration with the design team to

THOMAS MERTON HOUSE

ROLE: General Contractor Lorem ipsum dolor sit amet, consectetur adipiscing elit. Pellentesque in interdum nisl. In vitae mattis lorem. Nulla facilisi. Integer orci dui, euismod at ullamcorper sed, posuere eget velit. Quisque finibus lacinia sagittis. Integer mi lacus, imperdiet vel magna vel, egestas tempor felis. Duis consectetur consectetur quam, ut consectetur

BRISTOL HOSPITAL

ROLE: Construction Manager Bismark Construction acted as the CM from design development to construct a new 13,000 sf addition adjacent to Bristol Hospitals Operating center, adjoining their existing Emergency Department. Key challenges to this project were maintaining ambulance and pedestrian traffic throughout the course of construction. Upon completion of the

HARTFORD HEALTHCARE

ROLE: General Contractor The Hartford Healthcare Connecticut Orthopedic Renovation located at St. Vincent’s Medical Center is a multi-phased construction consisting off all brand-new infrastructure to accommodate new needs for orthopedic patients while conforming to today’s codes and regulations. Renovations included 21 new private patient rooms complete with walk in showers

BEARDSLEY ZOO

ROLE: Design Build We have completed several projects for this client, a zoo with special working requirements to provide strict management of their community. Our experience working in high-level areas has been redirected to match the zoo environment. Our management skills enable us to adapt to our clients’ needs. South American

GERALDINE CLAYTOR MAGNET ACADEMY

ROLE: Construction Manager This project consisted of two phases: Phase 1 remediation / demolition of an existing 72,500 sf elementary school along with capturing city streets to expand our six-acre site. Phase 2 was the construction of our new 75,000 sf school with park-like features, to complement the City of

Go to Top