Call Us Today! 203.876.8331

Construction Manager At Risk

Construction Manager At Risk

BASSICK HIGH SCHOOL

ROLE: Construction Manager The New Bassick High School. Our first task during pre-construction was to provide multiple site analysis reviews as multiple sites were options for the City of Bridgeport. Our staff includes architect and civil expertise that is able to offer collaboration with the design team to

TRUMBULL EARLY CHILDHOOD EDUCATION CENTER

ROLE: Construction Manager at Risk Trumbull Early Childhood Education center was constructed on the campus of Middlebrook Elementary School campus. This remained a fully operational campus during construction. During pre-construction we were able to work with the town BOE and building committee to understand the daily flow of the existing

YNHH SRC Daycare – Exterior

ROLE: Construction Manager The YNHH SRC Daycare project is an 11,600sf facility that was transformed from the former Ronald McDonald House at 501 George Street, New Haven, CT into a new daycare facility for the YNHH Saint Raphael’s Campus staff. Along with the interior renovation, the exterior clapboard and trim

YNHH SRC Daycare – Interior

ROLE: Construction Manager at Risk The YNHH SRC Daycare project is an 11,600sf facility that was transformed from the former Ronald McDonald House at 501 George Street, New Haven, CT into a new daycare facility for the YNHH Saint Raphael’s Campus staff.  The interior of the building was completely gutted to

GUILFORD CENTER FOR CHILDREN

ROLE: Construction Manager at Risk The Guilford Center for children acquired two historic barns on Stonehouse Road from the town of Guilford to renovate into their new childcare facility. The 100 year old barns are part of the historic Henry Whitfield State Museum property. The project consisted of completely gutting

Go to Top