Call Us Today! 203.876.8331

Featured Construction Manager

Featured Construction Manager

WESTHILL HIGH SCHOOL

ROLE: Construction Manager The proposed development will involve the demolition of the existing 350,000 square foot, two story brick masonry building, as well as the current softball/baseball fields and tennis courts. These facilities will be replaced with a brand new, state of the art 450,000 square foot high school designed to meet

PENFIELD PAVILION

ROLE: Construction Manager Bismark Construction acted as the CM from design development for remediation of the 29,445sf Penfield Pavilion located at Fairfield Beach and oversaw the excavation of an estimated 7,000 tons of contaminated soil underneath and around the perimeter of the building. This Project presented key challenges

GERALDINE CLAYTOR MAGNET ACADEMY

ROLE: Construction Manager This project consisted of two phases: Phase 1 remediation / demolition of an existing 72,500 sf elementary school along with capturing city streets to expand our six-acre site. Phase 2 was the construction of our new 75,000 sf school with park-like features, to complement the City of

WESTHILL AGRISCIENCE

ROLE: General Contractor Bismark Construction’s General Contracting division has been the driving component of the experience we bring to our clients. We built this new 48,000 sf vocational school as an anchor on the Westhill High School campus to tie it to the academic community. The project includes indoor and outdoor science

BLACK ROCK SCHOOL

ROLE: Construction Manager The Black Rock School project was an 18,000-sf addition to an existing school and a renovation of the existing fully occupied school to accommodate the owner’s needs. All work was condensed into an 8-month schedule during the school season. The major challenge with the school was to

Go to Top