WESTHILL HIGH SCHOOL

ROLE: Construction Manager The proposed development will involve the demolition of the existing 350,000 square foot, two story brick masonry building, as well as the current softball/baseball fields and tennis courts. These facilities will be replaced with a brand new, state of the art 450,000 square foot high school designed to meet

PENFIELD PAVILION

ROLE: Construction Manager Bismark Construction acted as the CM from design development for remediation of the 29,445sf Penfield Pavilion located at Fairfield Beach and oversaw the excavation of an estimated 7,000 tons of contaminated soil underneath and around the perimeter of the building. This Project presented key challenges

BEARDSLEY ZOO

ROLE: Design Build We have completed several projects for this client, a zoo with special working requirements to provide strict management of their community. Our experience working in high-level areas has been redirected to match the zoo environment. Our management skills enable us to adapt to our clients’ needs. South American

WESTHILL AGRISCIENCE

ROLE: General Contractor Bismark Construction’s General Contracting division has been the driving component of the experience we bring to our clients. We built this new 48,000 sf vocational school as an anchor on the Westhill High School campus to tie it to the academic community. The project includes indoor and outdoor science

City of Stamford Mold Task Force

ROLE: Construction Manager Bismark was engaged as the Construction Manager to be the lead coordinators for the required remediation work on seven schools assigned by the City of Stamford Mold Task Force as critical.  The scope of work was to access the water infiltration by field inspection and observation.  Once an

TOWANTIC POWER PLANT – OXFORD

ROLE: Design Builder, General Contractor Bismark Construction was hired to design build the Administration and Control Building at Towantic Power Plant in Oxford, CT.  The building was designed as a pre-engineered metal building to house the Aux Boiler, Electrical Room, and Warehouse serving the entire power plant.  The progress we made on

SHELTON ANIMAL SHELTER

ROLE: Design Build The center’s building committee hired Bismark to provide design build services for a new 6,000 sf animal shelter to meet their growing needs. Our Pre-Construction team explored the most current techniques available for the new facility and discussed options to meet the Owner’s needs. We suggested that the city

MONROE SCHOOL SECURITY UPGRADES

ROLE: Construction Manager The town of Monroe’s Board of Education reached out to us to fast-track new lock-down entry vestibules with the latest security surveillance requirements for this elementary school. We were able to control the systems from point of entry back to the main offices and install new visual windows for