HARTFORD HEALTHCARE

ROLE: Construction Manager at Risk The OR Expansion and Pre/Post-Op Renovation Project is an ambitious undertaking encompassing 88,099 square feet of transformative space. This multi-phased renovation will introduce six state-of-the art operating rooms and twelve new PACU bays to the hospital, redefining the surgical experience for patients and staff

WESTHILL HIGH SCHOOL

ROLE: Construction Manager The proposed development will involve the demolition of the existing 350,000 square foot, two story brick masonry building, as well as the current softball/baseball fields and tennis courts. These facilities will be replaced with a brand new, state of the art 450,000 square foot high school designed to meet

PENFIELD PAVILION

ROLE: Construction Manager Bismark Construction acted as the CM from design development for remediation of the 29,445sf Penfield Pavilion located at Fairfield Beach and oversaw the excavation of an estimated 7,000 tons of contaminated soil underneath and around the perimeter of the building. This Project presented key challenges

BRISTOL HOSPITAL

ROLE: Construction Manager Bismark Construction acted as the CM from design development to construct a new 13,000 sf addition adjacent to Bristol Hospitals Operating center, adjoining their existing Emergency Department. Key challenges to this project were maintaining ambulance and pedestrian traffic throughout the course of construction. Upon completion of the

HARTFORD HEALTHCARE

ROLE: General Contractor The Hartford Healthcare Connecticut Orthopedic Renovation located at St. Vincent’s Medical Center is a multi-phased construction consisting off all brand-new infrastructure to accommodate new needs for orthopedic patients while conforming to today’s codes and regulations. Renovations included 21 new private patient rooms complete with walk in showers