Bismark Construction was hired to design build the Administration and Control Building at Towantic Power Plant in Oxford, CT. The building was designed as a pre-engineered metal building to house the Aux Boiler, Electrical Room, and Warehouse serving the entire power plant. The progress we made on the Admin Control Building led to Gemma Power Systems to hire Bismark to erect (2) Boiler Feed Pump Buildings and associated Pipe Rack, as well as the building envelope of the Steam Turbine Generator building.